Pur Thermal
Pur Thermal — HVAC in Hickory, NC — is in the Hydra OS launch queue. The purthermal.com domain still parks on a GoDaddy courtesy page, so the honest before state is that parked page; the Hydra build is staged and no after performance claims are published until they are measured live.
This is the working Hydra staging site — open it anytime to see the build as it ships.
Open the live buildhttps://purthermal-dev.ciwebgroup.com/
Pur Thermal is an HVAC company in Hickory, NC. The company is onboarded in the CIWG client registry, which carries its verified business data for the build.
On 2026-07-22 the team captured purthermal.com as it publicly resolves today — a GoDaddy “parked free” courtesy page, not a company website. That parked page is the locked before asset. Pre-go-live Lighthouse mobile scores were also recorded against that same URL so the starting line is measurable; after scores wait for the live Hydra cutover.
The new Hydra OS build is already reachable as a staging build at https://purthermal-stg.ciwebgroup.com (dev preview: https://purthermal-dev.ciwebgroup.com), where the working homepage title reads “Purthermal | Precision OEM Thermal Components”. It follows the same launch discipline as every story on this page: the preview exists to be checked, not to make claims — scores and results are only published after they are measured on the live production domain.
Every page ships with structured brand intelligence built in, so Google and AI answer engines like ChatGPT, Perplexity, and Gemini can verify exactly what the business does — and new pages are submitted for indexing the moment they go live, not weeks later. It's all built on Hydra OS: a database-free architecture that's dramatically faster and harder to hack than a traditional WordPress site, with an intelligence layer that keeps it optimizing itself.
Before & after.
The before image is the live purthermal.com parked page captured 2026-07-22. The Hydra preview link is live for inspection; after imagery and scores land at cutover.
The starting line, measured.
Old-site scores, on the record. The after column lands the day the Hydra build goes live.
Before: Lighthouse (mobile), measured live on purthermal.com (parked page) — 2026-07-22, before Hydra cutover.
Build components going into this site.
4 components from the Hydra Build Components catalog are being built into the Pur Thermal build — mined from the build's source, not a marketing list. Every chip links to what that component does and costs.
Want a launch like this?
Every CI Web Group client launches on Hydra OS — the AI-first platform built to get home-service businesses found in both Google and AI search.
